Industrial PVC Powder Production Equipment Horizontal Ribbon Blender
HomeHome > Products > Horizontal Blender > Industrial PVC Powder Production Equipment Horizontal Ribbon Blender
Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Overview Detailed Photos Product Description 1) Horizontal ribbon mixer consists of U-shaped containers, ribbon mixing b
Overview
Basic Info.
Certification CE, ISO
Application Area Chemical
Layout Type Horizontal
Mixing Drum Shape Double Cone
Additional Capabilities Milling, Drying, Granulating, Coating
Operating type Continuous Operating
Condition New
Material SS304 or Ss306
Heating Way Oil Electric
Power 1400W
Transport Package by Sea
Specification 50L~3000L
Trademark JCT
Origin Foshan
HS Code 8474390000
Production Capacity 100pieces/Years
Product Description

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Detailed Photos

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Product Description

1) Horizontal ribbon mixer consists of U-shaped containers, ribbon mixing blade and transmission components.
2) The ribbon including continuous and disconnect.
3) The helical ribbon blade is made of a double or triple outer spiral the mateial from both sidesbrings together the central inner spiral the material transported from teh center to the sides to form a stream mixed.

Working performance

1) Adding a liquid and pasty materials mixed in the ribbon mixer for viscous of cohesive ganule mixing and granule has a good effect, cylinder cover can be made of a wide-open door, so that the equipment for cleaning.
2) Can be added to the mixer barrel outer jacket, cooling or heating of the mateial is achieved by injecting the cooling medium to the jacket.
3) Discharge in the form of a phenomenon of mateial accumulation and mixing dead ends, reliable trim seal, frquent switching lakage.

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

Product Parameters
Model

Volume

(L)

loading coefficient

Motor power

(KW)

Speed

(rpm)

WLDH-0.55000.4 ~ 0.64 ~ 7.542
WLDH- 110000.4 ~ 0.65.5 ~ 1142
WLDH- 220000.4 ~ 0.611 ~ 1542
WLDH- 330000.4 ~ 0.615 ~ 18.542
WLDH- 440000.4 ~ 0.618 ~ 3042
WLDH- 550000.4 ~ 0.622 ~ 3742
WLDH- 660000.4 ~ 0.630 ~ 4542
WLDH- 880000.4 ~ 0.637 ~ 5542
WLDH- 10100000.4 ~ 0.645 ~ 5542
WLDH- 12120000.4 ~ 0.645 ~ 75 42
WLDH- 15150000.4 ~ 0.655 ~ 9042

Industrial PVC Powder Production Equipment Horizontal Ribbon Blender

about us

CertificationsFAQQ : Can you send the formula for the products we want to make ?A : Our machines can be used for many kinds of product making ,such as Resin , Paint, Adhesive , Cosmetic , Food , Chemicals . There are many kinds of these products , so it's impossible for us to know all the formulas and technologies . We can assist you to find the raw material list you need , and after you place order with us , we can help you to find formula and technology , there will engineers to teach you how to make the product , and the cost will be on your account. Q : Do you have machines in stock ?A : Yes , but just the small-scale machines Machines are different with other products , most of the large-scale machines are designed according to our customers 'requirements different customers have different production requirements , so the technical parameter is different for most machines On the other hands , most of the our machines will cover a large area , so once the machines are finished , we will effect shipment after QC . Q : Can you send the detailed drawings of the machine to us before we place order ?A : We can send you a draft drawing of the machines , and after you place order and pay the deposit , our engineer will design the send you the detailed drawings . Once you confirm without questions , we will put it into production.Q : Why does it take at least 20 days to finish the machine ?A : Once receipt the deposit from you , we will design the drawings and make out the list of the materials and accessories for the production . Once the drawings are finished , our workers will start the production , from welding , polishing , assembling debugging , detection and so on . After finish , they need time to check the machines , if found any possible defect parts , they will return to the production until every part is 100% approved.Q : Can we pay the balance after we receive the machines and test without problem.A : It's unnessary to worry about the quality of our machines , we are confident in that . After the machine is finished . we can install and test the machine for you ( if you can not come to our factory ,we can record a video and send to you ) . Only after you check without problems , we will effect shipment .