Mini Diesel Engine Hydraulic Electric Wheel Rcm Loader with Vacuum Tyre for Sale
Diesel Electric Engine Wheel Backhoe Excavating Loader Mini Loader,other Universal EngineI. GDDC-0.5T ELECTRIC LOADER IN
Basic Info.
Model NO. | GDDC-0.4T |
Load and Unload Mode | Front Discharge |
Walking Mode | Wheeled |
Type | Small Loader |
Charging Time | 6 Hours |
Working Time | 6-8 Hours |
Color | Red/Green/Orange/Yellow |
Tire Model | 500-12 |
Net Weight | 800kg |
Technical Support | Video Call and Overseas Aftersale Point |
Scoop Volumen | 0.2 Cbm |
Walking Type | Wheel |
Width | 900mm |
Max. Discharge Height | 2200m |
Length | 2900mm |
Height | 1400mm |
Drive Motor | 1800W*2 |
Hydraulic Motor | 1500W |
Battery Type | 5 Units 12V*100ah |
Transport Package | Standard Packing |
Specification | 400KG |
Trademark | GUDAO ANDES |
Origin | China |
HS Code | 8429510000 |
Production Capacity | 500 Set/Year |
Product Description
Diesel Electric Engine Wheel Backhoe Excavating Loader Mini Loader,other Universal EngineI. GDDC-0.5T ELECTRIC LOADER INTRODUCTIONOur electric loader is designed to work for underground basement, upstairs construction work, underground tunnel mining work etc. It is designed basically on our already-existed product of large wheel loaders. So it has a better design idea. Due to the zere-emission, low noise and big torque hydraulic pump usage, we mini electric wheel loader is widely used in different areas like horse farm, basement earth moving and underground mining etc.
II. TECHNICAL INFORMATION
TECHNICAL PARAMETER | ||
ITEM | NAME | DESCRIPTION |
1 | Mini electric wheel loader | GDDC-0.5T |
2 | Dimension | 2900*900*1400MM |
3 | Scoop volume | 0.2 m³ |
4 | Load capacity | 400KG |
5 | Height | 1400MM |
6 | Max. discharge height | 2200MM |
7 | Battery type | 5 Unit 12V*100Ah |
8 | Drive model | 4×4 |
9 | Loader type | Articulado |
10 | Drive motor I | Front: 1800W |
11 | Drive motor II | Rear:1800W |
12 | Hydraulic electric motor | 1500W |
13 | Tire | 500-12 (Air/Solid) |
14 | Color | Green/Red/Orange/Yellow Customization |
V.PACKING AND DELIVERYVI. FAQ
1. How to load the site dumper:
a. For 20 GP container, we could load 2 units with bucket dismantled and all the equipments are will fastened;b. For 40 GP container, we could load 4 units the same way as we load in 20 GP container;c. For just 1 unit, we will do a standard wooden package with steel structure inside to meet LCL exporting standard;
2. What is the payment terms? Do you accept third party inspection?
a. The payment terms is 30% advance payment and 70% before delivery;b. Yes we accept third party inspection on buyer's cost;
3. What is your advantange?
a. Our factory has more than 15 years experience in producing contruction machinery like tricycle dumper, site dumper, electric dumper and loaders;b. We have our own R&D center to develop new designed products based on the product we have;c. All the published products are well tested by ourselve and our domestic customers already.
Send to us